Treatment References

Multi-utility waste treatment facility in Fos-sur-Mer

Urbaser Environnement - Fos sur MerUrbaser Environnement - Fos sur Mer
Adress of the plant :
Route du Port Minéralier
Zone Caban Sud
13210 Fos sur Mer - France
Project owner : Métropole Aix-Marseille Provence (13)
Type of contract :

Design, construction, financing, project management, and operation of a multi-utility waste treatment facility
Treatment capacity : 410 000 t/year of household and related waste
Technology implemented :
  • Mechanical sorting line for solid household waste
  • Methanisation unit for the organic fraction of solid household waste after sorting
  • Waste-to-Energy unit for the combustible fraction of waste after sorting
  • Waste air treatment unit
  • Excess water treatment unit
Electric power generation :
240 GWh/year
Organic Recovery Facility (French CVO) for biowaste in Calaisis

Urbaser Environnement - Sevadec CVOMR Project owner : SEVADEC (62)
Type of contract :
Design, construction and project management
Treatment capacity :

  • 46 000 t/y of household wastes
  • 6 000 t/y of landfilling
  • 800 t/y of cumbersome
Technology implemented :
  • Mechanical sorting line
  • Anaerobic digestion (Valorga Process)
Adress : 281 rue Jacques Monod - 62101 Calais - France
Methanisation plant in Varennes-Jarcy

Urbaser Environnement - VarennesUrbaser Environnement - Varennes
Adress of the plant :
SIVOM de la Vallée de l'Yerres et des Sénarts
Route du Tremblay
91480 Varennes-Jarcy - France
Project owner : SIVOM de la Vallée de l’Yerres et des Sénarts (91)
Type of contract :

Public service delegation to operate the household waste separation-methanisation-composting plant
Treatment capacity :

  • 70 000 t/year of residual household waste
  • 6 000 t/year of green waste
Technology implemented :



  • Pre-processing by 2 rotating drums
  • Mechanical sorting line
  • Methanisation unit (Valorga process)
  • Aerobic maturation in halls
  • Excess water treatment unit
Methanisation plant in Tondela (Portugal)

Urbaser Environnement - Tondela
Adress of the plant :
Vale de Marguanda
3465-013 
Campo de Besteiros Viseu -
Portugal
Project owner : City of Tondela
Type of contract :

Design, construction (except civil engineering), project management, and commissioning of the methanisation unit
Treatment capacity :

  • 30 000 t/year of solid household waste
  • 5 000 t/year of compostable waste
Technology implemented :
  • Mechanical sorting line
  • Anaerobic digestion (Valorga process)
  • Post-composting
  • Waste air treatment unit 
Biogas production :
136 Nm3/t entering methanisation
Waste sorting and composting facility in Beauregard Baret

Urbaser Environnement - Beauregard
Adress of the plant :
D532,
26300 Beauregard-Baret -
France
Project owner : SYTRAD (26)
Type of contract :

Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility
Treatment capacity : 30 000 t/year of solid household waste
Technology implemented :
  • Pre-fermentation by 2 rotating drums
  • Mechanical sorting line
  • Aerobic fermentation in halls
  • Aerobic maturation
  • Waste air treatment unit
Waste sorting and composting facility in Saint Barthélémy de Vals

Urbaser Environnement - St Barthelemy


Adress :
D532,
26300 Beauregard-Baret - 
France
Project owner : SYTRAD (26)
Type of contract :

Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility
Treatment capacity : 40 000 t/year of solid household waste
Technology implemented :
  • Pre-fermentation by 2 rotating drums
  • Mechanical sorting line
  • Aerobic fermentation in halls
  • Aerobic maturation
  • Waste air treatment unit
Modernisation of the Las Dehesas Environmental Complex 

Urbaser Environnement - Las dehesas

Adress of the plant :
Ctra. N-III. Km. 14 
(Villa de Vallecas) 
28051 Madrid - S
pain
Project owner : Community of Madrid (Spain)
Type of contract : Design and commissioning of the methanisation unit
Treatment capacity : 195 200 t/year of solid household waste 
Technology implemented :
  • Mechanical sorting line
  • Anaerobic digestion unit (Valorga process)
  • Aerobic maturation
  • Waste air treatment unit 
Biogas production :
130 Nm3/t entering methanisation
Modernisation of the treatment facility in La Paloma

Urbaser Environnement - La Paloma
Adress of the plant :
Ctra. N-III. Km. 14 
(Villa de Vallecas) 
28051 Madrid - Spain
Project owner : Community of Madrid (Spain)
Type of contract : Design and commissioning of the methanisation unit
Treatment capacity : 110 000 tonnes per year (methanisation)
Technology implemented :

  • Mechanical sorting
  • Methanisation (Valorga process)
  • Drying tunnels
  • Air treatment
Biogas production :


127 Nm3/t entering methanisation
Methanisation plant in Saragossa (Spain) 

Urbaser Environnement - Saragosse
Adress of the plant :Pol.Parq Tecnologico Reciclado 18 50720 Saragosse - Spain
Project owner : City of Saragossa (Spain)
Type of contract : Design and commissioning of the methanisation unit
Treatment capacity : 95 500 t/year of solid household waste
Technology implemented :




  • Mechanical sorting line
  • Anaerobic digestion unit (Valorga process)
  • Aerobic maturation
  • Waste air treatment unit
Multi-utility facility in Romainville

Urbaser Environnement - Romainville
Adress of the plant :
62 rue Anatole France
93200 Romainville - 
France
Project owner :
SYCTOM, l’Agence Métropolitaine des déchets ménagers (intercommunal household waste treatment and recycling syndicate) (75)
Type of contract :
Reconstruction and operation of the selective collection sorting facility
Treatment capacity :
Selective collection sorting facility: 45 000 t/year (extendible to 60 000 t/year)
Methanisation plant in the Ecopark of Abrunheira (Portugal)

Urbaser Environnement - Tratolixo

Adress of the plant :
Encosta di Sonivel
Nos Freguesios do San Miguel de Acaiçã e Mal Veiva
Municipio de Mafra
Distrito de Lisboa - 
Portugal
Project owner : TRATOLIXO (Portugal)
Type of contract :

Design, construction, and commissioning of the methanisation facility
Treatment capacity :

  • 160 000 t/year of solid household waste
  • 40 000 t/year of biowaste
Technology implemented :


  • Mechanical sorting line
  • Anaerobic digestion (Valorga)
  • Aerobic maturation unit
  • Waste air treatment unit
  • Liquid waste treatment station
Biogas production :


130-150 Nm3/t

Household waste sorting and composting Facility in Château d’Olonne

Urbaser Environnement - Trivalis



Adress of the plant :
Les Taffeneaux,
85180 Le Château-d'Olonne
France

Project owner : TRIVALIS (85)
Type of contract :


Design, construction, and project management of a mechanical-biological sorting and composting plant for household and related waste
Treatment capacity :
  • 36 000 t/year of residual household waste
  • 10 000 t/year of bulky household waste
Technology implemented :
  • Pre-fermentation by 1 rotating drum
  • Mechanical sorting line
  • Aerobic fermentation in tunnelss
  • Aerobic maturation
  • Waste air treatment unit
Household waste recovery unit in Bayonne (Canopia)